The first serial production facility for wooden wind turbine towers. The project is in the design phase with the location planned in Sweden.
Project 02
Wind Of Change
Status
Delivered
Project specs
Tower Height:
105 meters
Turbine:
V90-2.0MW
Total Height:
150 meters
Quantity:
One tower
Client:
Varberg Energi
Delivery Date:
2023


